This project consists of an installation of six vertical turbine pumps capable of pumping 600 gpm at 500 psi. The system has two surge tanks and high pressure control valves.
Construction of one 15,000 gpm ultimate capacity recycled water booster pump station including appurtenances and converting an existing potable water reservoir to a recycled water reservoir.