Installed three 50 horsepower pumps, two masonry buildings with wood framed roofs (one pump house, one chemical building), chemical building installation with chemical feed system for chlorine, phosphates, and ammonia, including chlorine analyzers and dosage pumps. Yard piping included the installation of approximately 500 lineal feet of 12-inch and 16-inch ductile iron pipe. Installed connections to existing water storage tanks with altitude valves, and earthquake flex joints.