City of Glendora
Greencroft Pump Station

This project consists of a deep excavation for the installation of a below ground pump station.  SEC excavated and shored a pit approximately 25 feet deep with piles and steel plates.  The pump station was then built inside the pit and consisted of three vertical turbine pumps capable of pumping 750 gallons per minute each.  The pump station was controlled via MCC and SCADA system.