Schuler Blog

Los Angeles County

This project consists of an installation of six vertical turbine pumps capable of pumping 600 gpm at 500 psi. The system has two surge tanks and high pressure control valves.

Golden State Water Company

Installed three 50 horsepower pumps, two masonry buildings with wood framed roofs (one pump house, one chemical building), chemical building installation with chemical feed system for chlorine, phosphates, and ammonia, including chlorine analyzers and dosage pumps.

Cucamonga Valley Water District

Construction of one 15,000 gpm ultimate capacity recycled water booster pump station including appurtenances and converting an existing potable water reservoir to a recycled water reservoir.

Elsinore Valley Municipal Water District

This project involved the construction of two potable water pump stations, a 1 million gallon steel water tank, a circular tied back shoring wall with a shot-crete facing, masonry buildings, chlorination facilities and associated site works. This was a 3.3 million dollar project that was completed on time and under estimate.